COMPLETED Projects
Askew Road Redevelopment
Project description
Transforming Askew Road – DEBMAT Surfacing’s Contribution to a Changing Gateshead
DEBMAT Surfacing Limited is working alongside Gateshead Council on the redevelopment of Askew Road (A184), a major route into the town. As road layout changes take shape, we’re proud to play a key part in improving local infrastructure and supporting the future of the wider community.
Improving a Vital Route Through Gateshead
Askew Road (A184) has long been a key corridor into the heart of Gateshead. Now, under the leadership of Gateshead Council, it’s undergoing a significant transformation — not just in terms of road layout, but as part of a wider vision to support housing development, active travel, and sustainable growth.
We at DEBMAT Surfacing Limited are proud to be part of that change. Our work on the resurfacing of Askew Road contributes directly to improving travel experiences for motorists, cyclists, and pedestrians, as well as laying the groundwork for future development along this route.
What’s Changing on Askew Road?
Gateshead Council’s plans aim to make the A184 better suited for the future of the town. While it’s still a major route for vehicles, the new layout reflects a shift toward residential growth and more people-friendly travel options.
- Dual carriageway becomes single carriageway:
The road is being narrowed from two lanes in each direction to one, calming traffic and reducing vehicle dominance in what will increasingly become a residential area. This helps strike a balance between road functionality and community liveability. - New pedestrian and cycling routes:
The redesign includes improved paths and crossings to make it easier and safer for people to walk or cycle. These active travel options are part of the council’s efforts to encourage more sustainable forms of transport. - Tree planting and landscaping:
The project brings in new greenery to soften the road environment and make the area more visually appealing. Planting trees along key sections of the route also helps with air quality, shade, and noise reduction. - Improved links to surrounding areas:
With Riverside Park, the town centre, and nearby housing all within reach, the new road layout is designed to better connect people to the places they live, work, and enjoy leisure time. - Footbridge removal and crossing upgrades:
The old pedestrian footbridge is being replaced with a modern street-level crossing, offering better access for people of all mobility levels, especially those using wheelchairs, pushchairs, or bicycles.
DEBMAT Surfacing’s Role in the Project
As specialists in highway surfacing and road infrastructure, our team at DEBMAT has been working hard on the ground to bring this vision to life.
- High-quality resurfacing of the road surface:
We’re delivering precision road resurfacing to ensure the road not only looks the part, but performs to the highest safety and durability standards. This isn’t just about fresh tarmac — it’s about laying a surface that lasts. - Minimising disruption for local residents and drivers:
We understand how important this route is for people getting to work, school, or home. That’s why our crews are working efficiently, keeping noise and disruption to a minimum while still delivering on schedule. - Working in sync with council timelines and contractors:
Collaboration is key on large-scale projects like this. We’ve worked hand-in-hand with Gateshead Council and their partners to ensure our part of the project fits seamlessly into the bigger picture. - Bringing decades of expertise to a high-profile job:
Our experience with both urban and rural resurfacing jobs means we know how to tackle every curve, camber, and corner — and Askew Road has its fair share of challenges, from gradients to high-traffic areas.
Why This Matters to Gateshead Residents
The changes happening along Askew Road are more than just cosmetic or functional — they speak to the wider ambitions for Gateshead’s future.
- Greater safety for everyone using the road:
Slower-moving traffic, better crossings, and clearer paths for pedestrians and cyclists all help make Askew Road a safer, more inclusive place to travel. - Healthier environment:
With more people walking or cycling, fewer lanes of traffic, and more green space, this redevelopment supports better air quality and overall wellbeing in the area. - Boost for local housing and neighbourhoods:
With hundreds of new homes planned nearby, a more residential-friendly road layout helps create a more welcoming environment for new families and supports local regeneration. - Improved access to key destinations:
Whether heading to the town centre, the riverside, or nearby communities, this new layout improves how easily people can get where they need to go — without relying solely on cars.
Stay in the Know
We know there’s a lot of local interest in what’s happening on Askew Road. Gateshead’s road network has been a hot topic — and understandably so, as these changes affect everyone.
To learn more about the council’s plans, visit Gateshead Council’s official update.
You can also follow DEBMAT Surfacing for further updates, behind-the-scenes content, and more on how we’re supporting better roads throughout the North East.
Facebook: https://www.facebook.com/DebmatSurfacing/
Twitter: https://x.com/debmatsurfacing
LinkedIn: https://www.linkedin.com/company/debmat-surfacing-ltd/
Project details
- Project: Askew Road Redevelopment
- Category: Roads
- Sector: Surfacing
- Client: Gateshead Council
- Location: Gateshead





What’s Changing on Askew Road?
DEBMAT Surfacing’s Role in the Project
Why This Matters to Gateshead Residents








