Armstrong Building, Hard Landscaping
Project description
Hard Landscaping – Armstrong Building, Newcastle University
| Project Details | |
|---|---|
| Project | Hard Landscaping |
| Material | Kerbs, Tarmac, Stone Mastic Asphalt |
| Border | Pin Kerb |
| Foundation | 75mm 6mm Tarmac, 60mm Binder Course |
| Drainage | New gully system, 15m Aco Drainage |
| Surface Course | 40mm thick 10mm close graded stone mastic asphalt |
| Timescale | Approx. 2 weeks |
The hard landscaping project at the Armstrong Building in Newcastle was meticulously planned to address multiple issues with the existing pathways and external features. The main focus was on enhancing the durability and appearance of the area while also addressing drainage problems and ensuring all surfaces were level and safe. Key aspects of the project included:
- Resurfacing of Existing Footpaths: Two sections of the existing flagged footpath were repaired and resurfaced with a 75mm layer of 6mm tarmac. This not only improved the surface quality but also ensured a long-lasting and aesthetically pleasing finish.
- Kerb Replacement and Realignment: Twenty damaged kerbs were raised and replaced to the correct levels, while the existing kerb line was repositioned to align perfectly with the new layout. Proper alignment is crucial for both safety and maintaining the visual appeal of the area.
- Tree Pit Removal: As part of the hard landscaping work, two tree pit concrete surrounds were removed before the trees themselves were taken out. This was necessary to make room for new landscaping elements and to prevent future issues with roots damaging the surrounding pathways.
- Installation of a New Gully System: A new gully system was installed to aid drainage, effectively channelling water into the existing drainage system. This improvement was vital for preventing water accumulation and potential damage to the newly laid surfaces.
- Aco Drainage Installation: To further address drainage concerns, 15 linear meters of Aco drainage were installed. This system is designed to manage surface water efficiently, reducing the risk of puddles and ensuring a safe and dry pathway.
- Ironwork Adjustment: As part of the comprehensive approach to hard landscaping, all ironwork in the area was raised and reset to ensure it aligned with the newly laid surfaces, enhancing both safety and aesthetics.
- Surface Planing and Asphalt Laying: Approximately 990m² of the existing surface was planed out to a depth of 100mm and properly disposed of. Following this, a 60mm binder course was laid, topped with a 40mm thick 10mm close-graded surface course of stone mastic asphalt. This multi-layered approach provides a robust and smooth finish, suitable for the heavy foot traffic expected around the university.
- Road Marking: The final stage of the project involved marking out all necessary road lines to ensure clear guidance for both pedestrians and vehicles, enhancing safety and navigation around the Armstrong Building.
Why Choose Professional Hard Landscaping Services?
The hard landscaping at Armstrong Building, Newcastle University, demonstrates the importance of professional landscaping services. Such projects require careful planning and execution to ensure not only aesthetic improvements but also the long-term functionality and safety of the area. From precise kerb placement to effective drainage solutions, every detail matters when it comes to enhancing an exterior space.

More Info on Our Hard Landscaping Services
The successful completion of the hard landscaping project at the Armstrong Building has transformed the area into a safer, more functional, and visually appealing environment. Newcastle University can now provide its community with an upgraded exterior that complements its historic architecture while ensuring practical usability for years to come.
For more information on our hard landscaping services in Newcastle and surrounding areas, feel free to contact us. Our team is experienced in delivering high-quality projects tailored to meet the unique needs of every site.
Project details
- Project: Armstrong Building, Hard Landscaping
- Category: Decorative, Footpaths, Groundworks
- Sector: Landscaping, Surfacing
- Client: Newcastle University
- Location: Newcastle







Why Choose Professional Hard Landscaping Services?